{"id":269,"date":"2015-02-02T13:02:41","date_gmt":"2015-02-02T17:02:41","guid":{"rendered":"http:\/\/blogs.duanemorris.com\/constructionlaw\/?p=269"},"modified":"2015-02-02T14:04:14","modified_gmt":"2015-02-02T18:04:14","slug":"president-orders-federally-funded-construction-projects-to-plan-for-flood-risks-from-climate-change","status":"publish","type":"post","link":"https:\/\/blogs.duanemorris.com\/constructionlaw\/2015\/02\/02\/president-orders-federally-funded-construction-projects-to-plan-for-flood-risks-from-climate-change\/","title":{"rendered":"President Orders Federally Funded Construction Projects To Plan For Flood Risks From Climate Change"},"content":{"rendered":"<p>On January 30, 2015, President Barack Obama signed an\u00a0executive order\u00a0requiring all federally funded construction projects to take into account flood risks linked to climate change.\u00a0 Federal agencies will now be required to account for the impact of possible flooding from rising sea levels resulting from global warming by meeting one of following three requirements:<\/p>\n<ul>\n<li>Use the best-available climate science.<\/li>\n<li>Build two feet above the 100-year (1 percent annual chance) flood elevation for standard projects and three feet above for critical buildings like hospitals and evacuation centers.<\/li>\n<li>Build to the 500-year (0.2 percent annual chance) flood elevation.<\/li>\n<\/ul>\n<p>The objective of the new policy is to build federal buildings and highways at safe distances away from flood areas that are expected to deteriorate as a result of climate change. &#8220;By requiring that Federally funded buildings, roads and other infrastructure are constructed to better withstand the impacts of flooding, the President\u2019s action will support the thousands of communities that have strengthened their local floodplain management codes and standards, and will help ensure Federal projects last as long as intended,&#8221; the White House Council on Environmental Quality said in a fact sheet.<\/p>\n<p>Rachel Cleetus, the lead economist and climate policy manager with the Climate and Energy Program at the Union of Concerned Scientists, called the President\u2019s action common sense. Below is Ms. Cleetus\u2019 statement.<\/p>\n<p>\u201cThis should be one of the least controversial executive orders the president has ever released. Why would the federal government build or repair buildings in ways that continue to put communities at risk? And why would we waste taxpayer dollars rebuilding in ways that are likely to result in repeated future flooding damages? This executive order is simply common sense. In fact, many communities across the country already recognize this and have issued building design guidelines that call for two feet of freeboard above the 100-year base flood elevation.<\/p>\n<p>\u201cThis standard hasn\u2019t been substantially changed in 37 years. Meanwhile, flood losses have increased and will continue to get worse with climate change, which is increasing flooding risks by contributing to higher seas and more severe storm surge along our coasts, and also heavier rains in some parts of the country. At the same time, more development in coastal areas is putting more people and property at risk.<\/p>\n<p>\u201cWe\u2019re also now seeing flooding on sunny days. Flooding during high tides\u2014something that rarely occurred in the past\u2014is now common in some places on the East and Gulf coasts of the U.S. Tidal flooding is expected grow to the point that sections of coastal cities will flood so often they\u2019ll become unusable in the near future, according to a study the Union of Concerned Scientists released in October. Most of the 52 coastal towns we looked at could see a tripling in annual tidal floods in 15 years and a tenfold increase in 30 years.<\/p>\n<p>\u201cIt\u2019s bad policy to rebuild in ways that perpetuate our risk of flooding and to sink taxpayer dollars into risky rebuilding efforts. Federal funds should instead be spent on making coastal communities more resilient to sea level rise and coastal flooding.\u201d<\/p>\n<p><span style=\"color: #262626;font-family: ArialMT\">To read the Executive Order, click <a title=\"Executive Order\" href=\"http:\/\/www.whitehouse.gov\/the-press-office\/2015\/01\/30\/executive-order-establishing-federal-flood-risk-management-standard-and-\" target=\"_blank\">here<\/a><\/span><span style=\"color: #262626;font-family: ArialMT\">.<\/span><\/p>\n<p><span style=\"color: #262626;font-family: ArialMT\"><span style=\"color: #262626;font-family: ArialMT\">To read the Federal Flood Risk\u00a0Management Standard, click <a title=\"Federal_Flood_Risk_Management_Standard\" href=\"http:\/\/www.fema.gov\/media-library-data\/1422649643416-c0ff9e51d11442790ab18bae8dc5df4b\/Federal_Flood_Risk_Management_Standard.pdf\" target=\"_blank\">here<\/a><\/span><\/span><span style=\"color: #262626;font-family: ArialMT\"><span style=\"color: #262626;font-family: ArialMT\">.<\/span><\/span><\/p>\n<p>To read the White House Council on Environmental Quality\u00a0fact sheet, click <a title=\"Fact sheet\" href=\"http:\/\/www.whitehouse.gov\/administration\/eop\/ceq\/Press_Releases\/January_30_2015\" target=\"_blank\">here<\/a>.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On January 30, 2015, President Barack Obama signed an\u00a0executive order\u00a0requiring all federally funded construction projects to take into account flood risks linked to climate change.\u00a0 Federal agencies will now be required to account for the impact of possible flooding from rising sea levels resulting from global warming by meeting one of following three requirements: Use &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/blogs.duanemorris.com\/constructionlaw\/2015\/02\/02\/president-orders-federally-funded-construction-projects-to-plan-for-flood-risks-from-climate-change\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;President Orders Federally Funded Construction Projects To Plan For Flood Risks From Climate Change&#8221;<\/span><\/a><\/p>\n","protected":false},"author":66,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[509,510,512,511,245],"ppma_author":[699],"class_list":["post-269","post","type-post","status-publish","format-standard","hentry","category-general","tag-climate-change","tag-federal-contracts","tag-flood-risks","tag-global-warming","tag-jose-aquino"],"authors":[{"term_id":699,"user_id":66,"is_guest":0,"slug":"jaaquino","display_name":"Jose A. Aquino","avatar_url":"https:\/\/blogs.duanemorris.com\/constructionlaw\/wp-content\/uploads\/sites\/6\/2014\/07\/aquinojose-125x150.jpg","0":null,"1":"","2":"","3":"","4":"","5":"","6":"","7":"","8":""}],"_links":{"self":[{"href":"https:\/\/blogs.duanemorris.com\/constructionlaw\/wp-json\/wp\/v2\/posts\/269","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.duanemorris.com\/constructionlaw\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.duanemorris.com\/constructionlaw\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.duanemorris.com\/constructionlaw\/wp-json\/wp\/v2\/users\/66"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.duanemorris.com\/constructionlaw\/wp-json\/wp\/v2\/comments?post=269"}],"version-history":[{"count":0,"href":"https:\/\/blogs.duanemorris.com\/constructionlaw\/wp-json\/wp\/v2\/posts\/269\/revisions"}],"wp:attachment":[{"href":"https:\/\/blogs.duanemorris.com\/constructionlaw\/wp-json\/wp\/v2\/media?parent=269"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.duanemorris.com\/constructionlaw\/wp-json\/wp\/v2\/categories?post=269"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.duanemorris.com\/constructionlaw\/wp-json\/wp\/v2\/tags?post=269"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/blogs.duanemorris.com\/constructionlaw\/wp-json\/wp\/v2\/ppma_author?post=269"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}