{"id":249,"date":"2026-06-23T11:43:28","date_gmt":"2026-06-23T15:43:28","guid":{"rendered":"https:\/\/blogs.duanemorris.com\/energyenvironmental\/?p=249"},"modified":"2026-06-23T11:43:29","modified_gmt":"2026-06-23T15:43:29","slug":"ferc-acts-advance-data-center-large-load-integration-six-rto-regions","status":"publish","type":"post","link":"https:\/\/blogs.duanemorris.com\/energyenvironmental\/2026\/06\/23\/ferc-acts-advance-data-center-large-load-integration-six-rto-regions\/","title":{"rendered":"FERC Acts to Advance Data Center and Large Load Integration in Six RTO Regions"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">By <a href=\"https:\/\/www.duanemorris.com\/attorneys\/ilialevitine.html\">Ilia Levitine<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">On June 18, 2026, the Federal Energy Regulatory Commission (FERC) issued show cause orders to six FERC-jurisdictional regional transmission organizations and system operators (RTOs) to further advance the integration of data centers and other large loads in the interstate electric transmission grid. The orders represent FERC\u2019s first substantive action in response to the\u00a0October 2025 rulemaking request\u00a0from the U.S. Department of Energy seeking to expedite the interconnection of data centers to the interstate transmission grid.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.duanemorris.com\/alerts\/ferc_acts_advance_data_center_large_load_integration_six_rto_regions_0626.html\">Read the full <em>Alert<\/em> on the Duane Morris LLP website<\/a>. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>By Ilia Levitine On June 18, 2026, the Federal Energy Regulatory Commission (FERC) issued show cause orders to six FERC-jurisdictional regional transmission organizations and system operators (RTOs) to further advance the integration of data centers and other large loads in the interstate electric transmission grid. The orders represent FERC\u2019s first substantive action in response to &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/blogs.duanemorris.com\/energyenvironmental\/2026\/06\/23\/ferc-acts-advance-data-center-large-load-integration-six-rto-regions\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;FERC Acts to Advance Data Center and Large Load Integration in Six RTO Regions&#8221;<\/span><\/a><\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[170,169,209],"ppma_author":[5],"class_list":["post-249","post","type-post","status-publish","format-standard","hentry","category-general","tag-data-centers","tag-ferc","tag-rto-regions"],"authors":[{"term_id":5,"user_id":6,"is_guest":0,"slug":"duanemorris3","display_name":"Duane Morris","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/843ff6e7a8fe5fc92109b47a45f34b6cf0ea499e6e788db23456c838b0ae6747?s=96&d=blank&r=g","author_category":"1","last_name":"Sullivan","first_name":"Margaret","job_title":"","user_url":"http:\/\/www.duanemorris.com","description":"<a href=\"http:\/\/www.duanemorris.com\">Visit the Duane Morris website.<\/a>"}],"_links":{"self":[{"href":"https:\/\/blogs.duanemorris.com\/energyenvironmental\/wp-json\/wp\/v2\/posts\/249","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.duanemorris.com\/energyenvironmental\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.duanemorris.com\/energyenvironmental\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.duanemorris.com\/energyenvironmental\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.duanemorris.com\/energyenvironmental\/wp-json\/wp\/v2\/comments?post=249"}],"version-history":[{"count":0,"href":"https:\/\/blogs.duanemorris.com\/energyenvironmental\/wp-json\/wp\/v2\/posts\/249\/revisions"}],"wp:attachment":[{"href":"https:\/\/blogs.duanemorris.com\/energyenvironmental\/wp-json\/wp\/v2\/media?parent=249"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.duanemorris.com\/energyenvironmental\/wp-json\/wp\/v2\/categories?post=249"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.duanemorris.com\/energyenvironmental\/wp-json\/wp\/v2\/tags?post=249"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/blogs.duanemorris.com\/energyenvironmental\/wp-json\/wp\/v2\/ppma_author?post=249"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}